Orders passed in petition From June 2020
Order passed in petitions before june 2020
Year Subject Parties Order  Date  
From To
 
Sno Petition No
Registration date
Parties Subject Procceding Date Of
Disposal/ Order
Status
1 01/2021
04-01-2021
Suo Motu विद्युत उपभोक्ता शिकायत निवरण फोरम, बिलासपुर के प्रकरण क्रमांक एल.टी./17/2020 आदेश दिनांक 29.09.2020 का परिपालन नहीं करने के संबंध में। See Proceeding
Under Process
2 02/2021
05-01-2021
Suo Motu
Vs
1. Chhattisgarh State Power Distribution Company Limited
Approval for supply of addl. 200 KVA over existing 500 KVA HT power supply on 11 KV in respect of M/s Shubh Minerals Private Limited , Dumarpara, Sakti, Distt-Janjgir Champa, B.P. No. 1022870 See Proceeding
Disposed off on
13-01-2021
Disposed
3 03/2021
06-01-2021
Chhattisgarh State Power Distribution Co Ltd FINAL TRUE UP OF FY 2018-19, PROVISIONAL TRUE UP OF FY 2019-20 AND DETERMINATION OF ARR FOR FY 2021-22 See Proceeding
Under Process
4 04/2021
12-01-2021
Chhattisgarh State Power Transmission Company Limited True Up of FY 2019-20 and Proposal of ARR and Transmission Tariff for FY 2021-22 See Proceeding
Under Process
5 05/2021
12-01-2021
CHHATTISGARH STATE LOAD DESPATCH CENTRE Final True-up of ARR for FY 2019-20 Proposal of ARR SLDC charges for FY 2021-22 See Proceeding
Under Process
6 06/2021
12-01-2021
Chhattisgarh State Power Transmission Company Limited Capital Investment Plan for FY 2021-22 See Proceeding
Under Process
7 07/2021
12-01-2021
JINDAL STEEL AND POWER LIMITED Petition for determination of Annual Revenue Requirement and retail tariff for FY 2020-21, revised estimate for FY 2019-20 along with true-up of FY 2018-19 for JSPL Distribution Business See Proceeding
Under Process
8 08/2021
12-01-2021
JINDAL STEEL AND POWER LIMITED Petition for determination of transmission tariff for FY 2020-21 along with revised ARR for FY 2019-20 and true up of the year FY 2018-19 for JSPL Transmission See Proceeding
Under Process
9 09/2021
13-01-2021
Chhattisgarh State Power Generation Company Limited Petition for True up of ARR of Conventional Thermal and Hydro Power Plants for FY 2019-20 and Determination of ARR of Conventional Thermal and Hydro Power Plants for FY 2021-22 See Proceeding
Under Process
10 10/2021
15-01-2021
Chhattisgarh State Power Generation Company Limited Petition for approval of Capital Investment Plan for FY 2021-2022 See Proceeding
Under Process
11 11/2021
21-01-2021
Chhattisgarh State Power Distribution Company Limi
Vs
1. Solar Energy Corporation of India Limited
Approval of Power Sale Agreement under section 63 read with section 86 clause 1 sub clause b of the Electricity Act 2003 See Proceeding
Order Passed On Order Sheet dated
05-03-2021
Disposed
12 12/2021
21-01-2021
Chhattisgarh State Power Distribution Company Limi
Vs
1. NHPC Limited
Approval of Power Sale Agreement under section 63 read with section 86 clause 1 sub clause b of The Electricity Act 2003 See Proceeding
Order passed on order sheet dated
05-03-2021
Disposed
13 13/2021
21-01-2021
Jayaswal Neco Industries Ltd
Vs
1. Chhattisgarh State Power Transmission Company Limited
The present complaint is being filed by the Petitioner under Section 142 of the Electricity Act, 2003, against the Respondent for non-compliance of the Chhattisgarh State Electricity Supply Code-2011, whereby the Honble Commission had made rules with respect to distribution and supply of electricity and the procedures thereofIt is stated that the Corporate Ispat Alloys Limited CIAL subsequently got merged with the Petitioner required regular 220 KV power supply and accordingly CIAL applied for the same to the Chhattisgarh State Electricity Board CSEB Erstwhile Entity of the Respondent vide its letter dated 3042007That, subsequently on 11042007, the Respondent in response to the application by the CIAL, issued a communication wherein the Respondent provided an estimated expenditure of Rs 6,86,91,000-for construction of 6 KM DCSS Line and 220 KV BayThat, CIAL, in accordance with the draft estimates provided by the Respondent paid an amount of Rs 8,27,98,000,00- Rs 6,86,91,000- along with the Security Deposit of Rs 1,41,07,000 for construction of the 6KM 220 KV DCSS Line, from Siltara Substation and 220 KV BaySubsequently, CIAL through its communication dated 14102008, also requested the Respondent to install dedicated 220 KV metering arrangement at 220 KV SS Urla, for metering of import of power by CSEB from CIAL and also requested to provide an estimated cost for the above said workThat, in Pursuance of the request for providing dedicated 220 KV metering arrangement at 220 KV SS Urla, for metering of import of power by CSEB from CIAL, the Respondent furnished the estimates vide its communication dated 27112008 The Respondent provided an estimated expenditure of Rs 45,40,600- That, CIAL deposited an amount of Rs 45,40,600-, with CSEB in two tranches of Rs 44,69,100- and Rs 71,541- on 12112008 and on 31122008 respectivelyHowever, the Respondent, after receipt of payment from the CIAL, issued a communication dated 13042009, informing that the dedicated 220 KV metering equipment was not available and instructed CIAL to procure the same equipment on its own cost from open marketThat, the Petitioner procured the metering equipment at its own cost and provided the same to the Respondent That, the Petitioner vide its letter dated 06082009, requested the Respondent, to refund the amount of Rs 32,36750- deposited by the Petitioner towards procurement of the said metering equipmentThat, even after the issuance of the aforesaid communication, the Respondent miserably failed to refund the amount of Rs 32,36,750- deposited by CIAL, towards procurement of the metering equipmentThat, on 17022011, CIAL once again wrote a communication to the Respondent demanding the refund of the amount towards procurement of the metering equipment Meanwhile, pending the clearance of refund, unit of CIAL, was merged with Jayaswal Neco Industries Limited, pursuant to a Scheme of Compromise and Arrangement sanctioned by the Honble Bombay High Court, Nagpur Bench, Nagpur, vide order dated 13112009 in Company Petition No 102009That, subsequently after a lapse of more than 4 years, the Respondent vide its letter dated 16122015, requested its Executive Director, to look into the Request of the Petitioner Even after the issuance of the aforesaid communication, the Respondent did not take any positive steps to refund the amount deposited by the CIAL towards procurement of metering equipment to the instant PetitionerThat, after a constant follow up by the Petitioner, the Respondent vide its letter dated 24012018, determined the final estimated expenditure in connection with the completion of the DCSS 6 KM Line, 220 KV Bay and instructed its relevant authority to initiate a refund of Rs 1,84,05,542- However, the concerned authority took into consideration an amount of Rs 6,72,47,000- as the deposited amount, whereas the actual amount deposited by the CIAL was 6,86,91,000 Thus, an amount of Rs 14,44,000- was still not refunded by the Respondent to the PetitionerThat, since an amount of Rs 46,80,750- Rs32,36,750-Rs14,44,000- was still lying with the Respondent, the Petitioner during the year 2018-2019 issued various communications to the Respondent to look into the matter and refund the required amount However, the Respondent paid no heed to the repeated requests by the PetitionerDue to the constant ignorance by the Respondent, the Petitioner was forced to issue legal Notice through its Counsel calling upon the Respondent to pay an amount of Rs 1,76,13,952- Principal Amount of Rs 59,84,600- along with the interest of Rs 1,16,29,352- calculated 1 PM After the receipt of the Legal Notice, the Respondent only with an intention to delay the process of refund to the Petitioner, has issued a communication dated 06022020, whereby it has asked the Petitioner to deposit the original money receipt of the amount deposited by the Petitioner towards the metering equipment It is pertinent to state that the said money receipt which was originally issued by See Proceeding
Under Process
14 14/2021
21-01-2021
JINDAL STEEL AND POWER LIMITED Petition for determination of the Annual Revenue Requirement and retail tariff for FY 2021-22, for the licensed business of distribution and retail supply of electricity under Section 45, 62 and 86 1 a of the Electricity Act, 2003 together with the relevant provisions of the Chhattisgarh State Electricity Regulatory Commissions Conduct of Business Regulations and Terms and Conditions for determination of Tariff Regulation and its amendments See Proceeding
Under Process
15 15/2021
21-01-2021
JINDAL STEEL AND POWER LIMITED Petition for determination of transmission tariff for FY 2021-22 for the licensed transmission business under Section 61, 62 and 86 1 a of the Electricity Act, 2003 together with the relevant provisions of the Chhattisgarh State Electricity Regulatory Commissions Conduct of Business Regulations and Terms and Conditions for determination of Tariff Regulations and its amendments See Proceeding
Under Process
16 16/2021
29-01-2021
Chhattisgarh State Power Generation Company Limited Petition for Determination of ARR Tariff of CSPGCLs Small-Mini Hydro Plants for FY 2017-18 to 2023-24 See Proceeding
Under Process
17 17/2021
26-02-2021
Suo Motu
Vs
1. Chhattisgarh State Power Distribution Company Limited
Approval for supply of addl. 350 KVA over existing 250 KVA HT power supply on 11 KV in respect of the Joint Director cum Superintendent, Dr. B. R. Ambedakar Memorial Hospital, Jail Road, Raipur, BP No. 1000550. See Proceeding
Disposed
18 18/2021
08-03-2021
Suo Motu
Vs
1. Town Electrical Engg Department Bhilai Steel Plant
Retail Tariff determination for FY 2021-22 for license distribution business at Bhilai Town shit area. See Proceeding
Under Process
19 19/2021
16-03-2021
Suo Motu
Vs
1. Chhattisgarh State Power Distribution Company Limited
Approval for supply of add. 250 KVA over existing 500 KVA HT power supply in respect of B.P. No. 1000547 at 11 KV supply of add. 200 KVA over existing 750 KVA HT power supply in respect of B.P. No. 1000564 on 11 KV issued to Dr. B. R. Ambedkar Raipur, See Proceeding
Disposed
20 21/2021
27-03-2021
Chhattisgarh State Power Distribution Co Ltd Additional Capital Investment Plan for Extended Year of 3rd Control Period FY 2021-22 for CSPDCL See Proceeding
Under Process
21 22/2021
27-03-2021
Madhya Bharat Power Corporation Limited
Vs
1. Chhattisgarh State Power Distribution Company Limited
Approval of Provisional Tariff under Sections 62(1)(a) And 86(1)(a) Of Electricity Act 2003 read with Chhattisgarh State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff according to Multi-Year Tariff Principles and Methodology and Procedure for Determination of Expected Revenue from Tariff and Charges) Regulations, 2015 for Sale of Power, generated by 113 MW Rongnichu Hydro-Electric Project, Sikkim, to Chhattisgarh State Power Distribution Company Limited. See Proceeding
Under Process
22 23/2021
27-03-2021
Chhattisgarh Pradesh Vidyut Upbhokta Sanrakshan Parishad अभ्यावेदन विद्युत अधिनियम 2003 की धारा (142) के अंतर्गत आयोग द्वारा बनाए गए “छत्तीसगढ़ राज्य विद्युत नियामक आयोग (ग्रीड इंटरैक्टिव विकेन्द्रित नवीनीकरण उर्जा स्त्रोत) विनियम 2019 का उल्लघंन बावत। See Proceeding
Under Process
23 50/2020
29-06-2020
Solbridge Energy Private Limited
Vs
1. Chhattisgarh State Power Distribution Company Limited
2. Chhattisgarh State Power Transmission Company Limited
Petition under section 86 1, (e), f, k and section 43 of the Electricity Act, 2003, for grant of permanent Electricity connection of 500 kVA at 132 kV for the plants start up power and auxiliary consumption in terms of Regulation 3.4 and Regulation 3.5 read with Regulation 12.12 and 12.13 of the Chhattisgarh State Electricity Supply Code, 2011 as amended from time to time. See Proceeding
Order passed on
18-06-2020
Under Process
24 51/2020
08-07-2020
Suo Motu
Vs
1. Chhattisgarh State Power Distribution Company Limited
2. Chhattisgarh Pradesh Vidyut Upbhokta Sanrakshan Parishad
3. Vimal Construction
The matter of selling electricity to Ravi Bhavan shops by Vimal Construction. See Proceeding
Under Process
25 52/2020
29-06-2020
Chhattisgarh State Power Distribution Company Limi
Vs
1. Madhya Bharat Power Corporation Limited
Petition for approval of power purchase from 96 MW installed capacity Rognichu Hydro-electric Project located in the East Sikkim District of Sikkim and approval of Power Purchase Agreement entered between CSPDCL and Madhya Bharat Power Corporation Limited See Proceeding
Order passed on
31-03-2021
Under Process
26 53/2020
15-07-2020
Suo Motu
Vs
1. Chhattisgarh State Power Distribution Company Limited
Non-compliance of directive given to CSPDCL in tariff order for FY 2019-20. See Proceeding
Under Process
27 54/2020
15-07-2020
Suo Motu
Vs
1. S V Power Private Limited
In the matter of generation and consumption of power plant in the State, for the year 2018-19. See Proceeding
Disposed
28 55/2020
10-08-2020
Suo Motu
Vs
1. JINDAL STEEL AND POWER LIMITED
In the matter of generation and consumption of power plant in the State, for the year 2018-19. See Proceeding
Disposed
29 56/2020
10-08-2020
Suo Motu
Vs
1. BHARAT ALUMINIUM COMPANY LIMITED
In the matter of generation and consumption of power plant in the State, for the year 2018-19. See Proceeding
Disposed off on
01-02-2021
Disposed
30 57/2020
10-08-2020
Suo Motu
Vs
1. ACB INDIA LTD TPP Village Renki PO Chainpur Teh Pali Dist Korab CG
In the matter of generation and consumption of power plant in the State, for the year 2018-19. See Proceeding
Disposed
31 58/2020
10-08-2020
Suo Motu
Vs
1. JINDAL STEEL AND POWER LIMITED
2. JINDAL STEEL AND POWER LIMITED
3. Chhattisgarh State Power Distribution Company Limited
In the matter of generation and consumption of power plant in the State, for the year 2018-19. See Proceeding
Under Process
32 59/2020
10-08-2020
Suo Motu
Vs
1. Chhattisgarh State Power Distribution Company Limited
Optional Night Tariff. See Proceeding
Disposed
33 60/2020
15-07-2020
Bharat Aluminium Company Limited
Vs
1. Chhattisgarh State Power Trading Company Limited
2. Chhattisgarh State Power Distribution Company Limited
Determination of Variable Cost for the FY 2018-19 to 2020-21 See Proceeding
Reseraved For Order
34 61/2020
10-08-2020
Suo Motu Modality for renewable energy banking, accounting, settlement and wheeling. See Proceeding
Interim Order on
23-03-2021
Reseraved For Order
35 62/2020
16-10-2020
मेसर्स बिरमीवाल स्टील प्रा. लि.
Vs
1. Chhattisgarh State Power Distribution Company Limited
अभ्यावेदन विद्युत अधिनियम, 2003 की धारा 142 व धारा 146 के अंतर्गत आयोग द्वारा बनाए गए नियमों एवं विनियमों का उल्लघन एवं विद्युत लोकपाल के प्रकरण क्रं. 16/2006 में पारित आदेश दिनांक 29/05/2007 का अनुपालन न किये जाने के संबंध में। See Proceeding
Order passed on
23-03-2021
Reseraved For Order
36 63/2020
10-08-2020
Chhattisgarh State Power Generation Company Limited Petition for In principle approval for Installation of FGD and DeNOx Systems and approval for Additional Capital Investment related to Ash Ponds See Proceeding
Under Process
37 64/2020
14-08-2020
JINDAL STEEL AND POWER LIMITED Review Petition for review of order dated 10th FEB 2020 in Petition No 66 of 2018 T for Determination of the Multi Year Annual Revenue Requirement for JSPL- Transmission business for the Control Period from FY 2016-17 to FY 2020-21 along with true-up of FY 2012-13 to FY 2016-17 See Proceeding
Order passed on
18-02-2021
Reseraved For Order
38 65/2020
30-09-2020
Suo Motu
Vs
1. Loknath Nayak
2. Chhattisgarh State Power Distribution Company Limited
सराईपाली के विद्युत संभागों के समस्त वितरण केन्द्र, पिथौरा संभाग का सांकरा वितरण केन्द्र तथा कसडोल विद्युत संभाग के चांदन वितरण केन्द्र के अधिकारियों द्वारा नियमों का अनुपालन न कर मनमानी किए जाने की शिकायत। See Proceeding
Under Process
39 66/2020
13-10-2020
Venika Hydro Projects Private Limited
Vs
1. Chhattisgarh State Power Transmission Company Limited
2. Chhattisgarh State Power Distribution Company Limited
Petition to change the reverse power to relay at receiving end substation, Pratappur. See Proceeding
Order Passed
08-10-2020
Reseraved For Order
40 67/2020
28-08-2020
Raigarh Energy Generation Limited
Vs
1. Chhattisgarh State Power Trading Company Limited
Petition for determination of Energy Charges Rate under CSERC Terms and Conditions for determination of tariff according to Multi-Year Tariff principles and Methodology and Procedure for determination of Expected revenue from Tariff and Charges Regulations, 2015 and Section 86-1-a of the Electricity Act, 2003 read with Section 62 of Electricity Act, 2003 for supply of five percent of Power from 600 MW coal based Thermal power plant of Raigarh Energy Generation Limited, Raigarh, Chhattisgarh und See Proceeding
Reseraved For Order
41 68/2020
28-08-2020
DB Power Limited
Vs
1. Chhattisgarh State Power Trading Company Limited
2. Chhattisgarh State Power Distribution Company Limited
The present Petition is being filed for truing up of the Energy charges of Rs 3050- unit as well as for approval of reimbursable expenses of Rs 0071 unit for the period 01042019 to 31032020 in respect of the 5 of the net generated power being procured by the Respondents pursuant to the long term PPA dated 05102011 The Petitioner is also seeking approval of provisional energy charges of Rs 3050 unit and other reimbursable expenses of Rs 0071 unit for FY 2021-22 See Proceeding
Under Process
42 69/2020
03-10-2020
Suo Motu
Vs
1. Ramji Kushwaha
2. Chhattisgarh State Power Distribution Company Limited
Release of Electricity connection to the residents of Durga Vihar Colony, Dunda, Raipur - regarding complaint by Durga Vihar Kalyan Samiti. See Proceeding
Disposed
43 70/2020
07-10-2020
Bharat Aluminium Company Limited
Vs
1. Chhattisgarh State Power Distribution Company Limited
2. Superintending Engineer Circle
PETITION UNDER SECTION 86 1 f k OF THE ELECTRICITY ACT, 2003 ON BEHALF OF THE PETITIONER VIZ BHARAT ALUMINIUM COMPANY LTD, PRAYING FOR QUASHING SETTING ASIDE THE ILLEGAL CLAIM MADE BY THE RESPONDENTS FOR PAYMENT OF CROSS SUBSIDY SURCHARGE, VIDE ITS IMPUGNED INVOICE DATED 02072020, 07072020, 22072020, 04082020, 02092020 AND LETTER DATED 29082020 ON ACCOUNT OF PROCUREMENT OF POWER UNDER OPEN ACCESS BY THE PETITIONER See Proceeding
Under Process
44 71/2020
07-10-2020
Uniworth Ltd
Vs
1. Chhattisgarh State Power Distribution Co Ltd
Application for fixation of Retail Electricity Tariff for Export Oriented Units under provisions made in Section 62-3, 62-4 and 86-1-a of Electricity Act 2003 and Industrial Policy year 2019-24 notified by Government of Chhattisgarh See Proceeding
Disposed
45 72/2020
07-10-2020
Prayash Steel
Vs
1. Chhattisgarh State Power Distribution Company Limited
2. Chhattisgarh State Power Distribution Co Ltd
3. Chhattisgarh State Power Distribution Company Ltd
4. Chhattisgarh State Power Distribution Company Ltd
Determination of balance outstanding dues and grant of facility of installments in clearing such dues towards Respondent with reference and compliance to the Order of Honourable High Court of Chhattisgarh, Bilaspur in WPC No1424-2020 dated 09-7-2020 See Proceeding
Order Passed on
24-03-2021
Reseraved For Order
46 73/2020
07-10-2020
Jorawar Engg Foundry Forge P Ltd
Vs
1. Chhattisgarh State Power Distribution Co Ltd
In the matter of seeking interpretation with respect to Force Majeure Clauses 13-1 and 13-2 of Chhattisgarh Electricity Supply Code 2011 under Power of Interpretation Clause 13-19 and Power to remove Difficulty Clause 13-21 See Proceeding
Order Passed on
22-03-2021
Reseraved For Order
47 74/2020
21-10-2020
Ms GR SPONGE AND POWER LIMITED Petition filed by Ms GR Sponge and Power Limited under Section 861 e of the Electricity Act, 2003 read with Regulation 44 of Chhattisgarh State Electricity Regulatory Commission Conduct of Business Regulations, 2009, for Promotion of generation and co-generation of electricity through Waste Heat Recovery Boiler as renewable energy resource and inclusion of same under REC Mechanism See Proceeding
Under Process
48 75/2020
22-10-2020
NTPC LIMITED TALAIPALLI COAL MINING PROJECT
Vs
1. CSPDCL
Petition for Approval of Extension of Reduction in Sanctioned load of Talaipalli Coal Mining Project of NTPC Ltd See Proceeding
Disposed
49 76/2020
23-10-2020
Suo Motu
Vs
1. Jindal Power Limited
2. Chhattisgarh State Power Trading Company Limited
3. Chhattisgarh State Power Distribution Company Limited
Suo Motu review Petition No. 44 of 2017-T in order dated 06/05/2020. See Proceeding
Order Passed on
25-03-2021
Under Process
50 77/2020
29-10-2020
Chhattisgarh State Load Dispatch Centre Non compliance of BDI See Proceeding
Order passed on
05-03-2021
Reseraved For Order
51 78/2020
29-10-2020
Chhattisgarh State Load Dispatch Centre
Vs
1. JINDAL STEEL AND POWER LIMITED
Non compliance of BDI See Proceeding
Order passed on
05-03-2021
Reseraved For Order
52 79/2020
29-10-2020
Chhattisgarh State Load Dispatch Centre
Vs
1. SKS Ispat and Power Limited
Non compliance of BDI See Proceeding
Order passed on
05-03-2021
Reseraved For Order
53 80/2020
29-10-2020
Chhattisgarh State Load Dispatch Centre Non compliance of BDI See Proceeding
Order passed on
05-03-2021
Reseraved For Order
54 81/2020
29-10-2020
Chhattisgarh State Load Dispatch Centre
Vs
1. Vandana Global Limited
Non compliance of BDI See Proceeding
Order passed on
05-03-2021
Reseraved For Order
55 82/2020
29-10-2020
Chhattisgarh State Load Dispatch Centre
Vs
1. Ms Real Ispat and Power Limited
Non compliance of BDI See Proceeding
Order passed on
05-03-2021
Reseraved For Order
56 83/2020
29-10-2020
Chhattisgarh State Load Dispatch Centre
Vs
1. Ms Jagdamba Power And Alloys Limited
non compliance of BDI See Proceeding
Order passed on
05-03-2021
Reseraved For Order
57 84/2020
29-10-2020
Chhattisgarh State Load Dispatch Centre Non compliance of BDI See Proceeding
Order passed on
05-03-2021
Reseraved For Order
58 85/2020
29-10-2020
Chhattisgarh State Load Dispatch Centre
Vs
1. Ms Chhattisgarh Steel Power Ltd
Non compliance of BDI See Proceeding
Order passed on
05-03-2021
Reseraved For Order
59 86/2020
29-10-2020
CONFEDERATION OF REAL ESTATE DEVELOPERS ASSOCIATIO
Vs
1. Chhattisgarh State Power Distribution Company Limited
PETITION UNDER SECTION 86 1 A OF THE ELECTRICITY ACT, 2003 See Proceeding
Under Process
60 87/2020
29-10-2020
Jayaswal Neco Industries Ltd
Vs
1. Chhattisgarh State Power Distribution Company Limited
Review petition under Sec 94f of Electricity Act 2003, for quashing minimum charges imposed under Tariff Order 2006-07 The Abhijeet Infrastructures Ltd (AIL) installed a 350 Tonne per day capacity of Sponge Iron Plant along with 15 MW Power Plant at Siltara, Raipur. AIL applied for temporary connection with the Chhattisgarh State Electricity Board, which was duly approved on 04.01.2007 for a requisition demand of 1660 KVA. This Hon’ble Commission in the tariff order for the financial year See Proceeding
Under Process
61 88/2020
11-10-2020
Sai Lilagar Power Generation Limited
Vs
1. Chhattisgarh State Power Trading Company Limited
2. Chhattisgarh State Power Distribution Company Limited
Petition for Truing Up of Energy Variable Charges as well as for approval of other reimbursable expenses for the period September 2013 to July2017, AND for approval of methodology for determination of tariff and other reimbursable expenses for the subsequent period in terms of Section 62, 86 1 b and other applicable provisions of the Electricity Act, 2003 read with Tariff Policy in respect of 5 of the net generated power procured by the Respondent as per the terms of the Power Purchase Agreement See Proceeding
Under Process
62 89/2020
11-10-2020
KSK Mahanadi Power Company Limited
Vs
1. Chhattisgarh State Power Trading Company Limited
2. Chhattisgarh State Power Distribution Company Limited
Petition for Truing Up of Energy Variable Charges as well as for approval of other reimbursable expenses for the period September 2013 to March2020, AND for approval of methodology for determination of tariff and other reimbursable expenses for the subsequent period in terms of Section 62, 64 5, 86 1 b and other applicable provisions of the Electricity Act,2003 read with Tariff Policy in respect of 5 percent of the net generated power procured by the Respondent as per the terms of the Power Purc See Proceeding
Under Process
63 90/2020
01-12-2020
Suo Motu
Vs
1. AMIT POHA MILL
2. Chhattisgarh State Power Distribution Company Limited
विद्युत लोकपाल, रायपुर के प्रकरण क्रमांक 13/2019 में पारित आदेश दिनाँक 18/05/2020 के परिपालन न किए जाने के संबंध में। See Proceeding
Under Process
64 91/2020
07-12-2020
Vijay Khandelwal
Vs
1. Chhattisgarh State Power Distribution Company Limited
बकाया राशि भुगतान न किए जाने के संबंध में आवेदन अंतर्गत 142 विद्युत अधिनियम, 2003। See Proceeding
Disposed
65 92/2020
10-12-2020
Chhattisgarh State Power Distribution Company Limi Petition under Section 63 read with Section 86 1 b of the Electricity Act, 2003 and Clause 76 of the Guidelines for Tariff Based Competitive Bidding Process for Grid Connected Power Projects Based on Renewable Energy Sources notified by MNRE for adoption of tariff discovered through competitive bidding process conducted vide RfP No 02-02ACE-IBiomass01 dated 15102015, for procurement of power from Biomass based Power Project being set up at Village Kurandi, Tahsil Jagdalpur, District Bastar, CG, See Proceeding
Order passed in order sheet dated
31-03-2021
Reseraved For Order
66 93/2020
10-12-2020
Chhattisgarh State Power Distribution Company Limi
Vs
1. RR ENERGY LIMITED
Petition under Section 63 read with Section 86 1 b of the Electricity Act, 2003 and Clause 76 of the Guidelines for Tariff Based Competitive Bidding Process for Grid Connected Power Projects Based on Renewable Energy Sources notified by MNRE for adoption of tariff discovered through competitive bidding process conducted vide RfP No 02-02ACE-IBiomass01 dated 15102015, for procurement of power from Biomass based Power Projects, located at Garhumaria, Raigarh, for Long Term of 20 years See Proceeding
Under Process